Victoria Terminal 4 Phase 2, Belfast

Gallery
Victoria Terminal 4 Phase 2 featured image.jpg
Client Belfast Harbour Commissioners
Value £5,293,700
Duration 11 Weeks
D&B Partner Doran Consulting

Design and installation of rock and concrete mattress for scour protection to the existing RoRo berth facility at VT4. Works included dredging of existing seabed to design profile for scour protection and mass dredging to the existing shipping channel to increase draft.