Translink Gault’s Crossing, Ballymena

  • Civil Engineering
  • ClientTranslink
  • Value£440,000
  • Duration36 weeks
  • Employers Representative WDR & RT Taggart
Translink Gault’s Crossing, Ballymena

This project involved a safety led enhancement to eliminate a high-risk level crossing and therefore eliminating significant risks to road / train users and the operational railway.

The works included replacement of an existing at-grade accommodation crossing with a new, 14m long bridge over a live railway line, with construction of approach embankments, segmental wing walls and 200m length of insitu reinforced concrete access road.