Back to Projects

The Peak Leisure Facility, Stirling

  • Construction
  • ClientStirling Council
  • Value£24,000,000
  • Duration88 weeks
  • Architect S+P Architects
The Peak Leisure Facility, Stirling

Design and construction of an integrated wet and dry leisure facility, combining swimming with dry sports in one building, to offer the public access to a maximum variety of sports at a single location.

The facilities include a nine court sports hall; 25 metre, 6 lane swimming competition pool, learner pool complete with moveable floor and confidence pool; six sheet ice rink, health and fitness facilities and a 12 metre climbing wall plus café and licensed restaurant facilities.

The development also includes outdoor floodlit third generation football and rugby pitches plus a water-based hockey pitch.

Would you like to discuss a project?

Contact