Skerries Tidal Array Cost Reduction

Gallery
Skerries Tidal Array Cost Reduction featured image.jpg
Client MCT Siemens
Value £150,000
Duration 6 weeks
D&B Partner MMI Engineering

On an ECI basis, McLaughlin & Harvey Offshore completed a study in collaboration with MMI Engineering and the design team at Marine Current Turbines to optimise an installation technique devised in-house to reduce installation cost and introduce innovative measures to limit the requirement for tidally dependant operations. The study also included compilation of risk mitigation matrices, weather delay and weather sensitivity analysis as well as step by step methodology development and story boarding.