George Best Airport, Belfast

  • Construction
  • + Frameworks Division
  • ClientGeorge Best Belfast City Airport
  • Value£3,050,000
  • Duration29 weeks
  • Architect BDP
George Best Airport, Belfast

Internal reconfiguration of Terminal along with an airside extension to accommodate a new Satellite Hub and Que-Space.

Works included the relocation of the departure lounge and airline offices to the first floor, enhancement of security search facilities, reconfiguration of BMI lounge, and fit-out of Flybe lounge.

Our Frameworks division designed, supplied and fitted Metal Technology aluminium curtain walling to form a link between the new first floor lounge and the departure gates.

The work was phased to minimise disruption to passengers and aircraft.