Back to Projects

Edinburgh Tramway Depot

  • Construction
  • ClientTIE / Bilfinger Berger
  • Value£16,000,000
  • Duration55 weeks
  • Architect McLaughlin & Harvey Technical Services
Edinburgh Tramway Depot

New maintenance facility with associated workshops, office accommodation and staff areas and external works and landscaping.

The new tram depot facilities consisted of 3 lane tram maintenance hall with concrete pits, gantry crane and island platforms; bogie hall with lifting jack equipment; tram wash hall; sand filing hall; associated staff areas included WC and shower facilities / locker room, canteen area, drying room.

As well as, an infirmary / first aid area; office accommodation, workshops and storage area; new substation and power energy centre buildings; and tram control centre.

Feature of ProjectValue Engineering

The project was procured through a stage 2 approach. We were able to add significant value to the project through the second stage tender period, by working collaboratively with the client, design team and our supply chain. We were able to reduce the tender costs through alternative design solutions for cut and fill, sustainable design and frame design.

Value Engineering

Would you like to discuss a project?

Contact