Search
Reconstruction of Thompson's Bridge along with associated scour protection, road realignment, service diversions, and demolition of the existing road bridge over the environmentally sensitive Cladagh River.
The project was value engineered, which resulted in the proposed two span bridge structure being reduced to a single span, eliminating the requirement for a central pier and offering both environmental benefits and cost savings to the scheme.