Search
Design & build of a pair of 12.5m high miter dock gates within this 100-year old masonry dock.
Operations carried out at the entrance to the live Milford Haven Port included berthing pontoons in the shortened lock, a new control building, repairs to existing infrastructure, piling, pre-cast concrete abutments with insitu works, car park reinstatement, and underwater diving operations.