Hamilton Graving Dock, Belfast

  • Civil Engineering
  • ClientBelfast Harbour Commissioners
  • Value£375,000
  • Duration16 weeks
  • Employers Representative Doran Consulting
Hamilton Graving Dock, Belfast

Restoration of the Hamilton Graving Dock in preparation for the SS Nomadic arriving for repairs prior to the Tall Ships Festival during the summer of 2009.

Works included the fabrication and placement of a new dry dock gate.

The existing dry dock gate was refloated and relocated onto a newly fabricated cradle within the dry dock.