Reconstruction of 110m of quay wall on Berths 7 and 9 within Runcorn Docks.
Works involved the reconstruction of the quay wall which was not operational following a collapse of the existing dock wall. The project provided two working berths for use by general and bulk cargo vessels, with a draught of 7m and up to 7000t.
The remaining berths within the dock, including berth 6 and 8 directly opposite, and landside areas remaining live at all times.