Fenton Dock Berths 7 and 9 Reconstruction, Runcorn

  • Civil Engineering
  • ClientPeel Ports Ltd
  • Value£3,300,000
  • Duration52 weeks
  • D&B Partner RPS
Fenton Dock Berths 7 and 9 Reconstruction, Runcorn

Reconstruction of 110m of quay wall on Berths 7 and 9 within Runcorn Docks.

The quay wall which was not operational following a collapse of the existing dock wall.

Works include the provision of two working berths for use by general and bulk cargo vessels, with a draught of 7m and up to 7000t.

The remaining berths within the dock, including berth 6 and 8 directly opposite, and landside areas remaining live at all times.